JEFFERSON CITY, Mo. -The following is a list of general highway maintenance and construction work planned in the mid-Missouri area Nov. 11 - 17, 2024. Weather conditions may postpone scheduled work. Many projects will include lane closures whichcould cause delays.  

All Counties

Moving operations such as pothole patching, mowing, brush cutting,and pavement repair continue in various locations. Motorists should travel with care and be alert for slow- moving equipment.

All work is weather permitting, and schedules are subject to change.

Boone County

Interstate 70westbound, Route O, and Route J - Bridge repair continues onwestbound I-70 over Routes O and J.The project is scheduled for completion in November 2024. Traffic impacts include:

  • The right-hand (driving) lane of westbound I-70 isrerouted to the on- and off- ramps at Exit 117for the duration of the repair project.
  • Routes O and J are CLOSEDunder the bridge.
  • Route O is detouredto Route BB (Exit 115).
  • Route J is detouredto U.S. Route 40 (Exit 121).
  • No access to/from westbound I-70 and Routes O and J.
  • No accessto/from eastbound I-70 andRoute J.
  • Eastbound I-70 to/fromRoute O remainsopens.

I-70- Bridge construction continues for the new Rocheport Bridge near mile marker 115. The new eastbound bridge is scheduled to open to trafficin December 2024. 

Route TT - Upgrades to pedestrian facilities planned on Broadwaybetween Route ZZ and Silvey Street. The work is being done bythe city of Columbia. The project is scheduled for completion in December2024.

U.S. Route 63 - Bridge construction continues on U.S. Route 63 between the Broadway overpass and Conley Road underpass in Columbia. U.S. Route 63 will remain open but in a head-to-head configuration with narrowed lanes and reduced speeds. This traffic pattern is expected to be in place through late 2025. The bridge construction is part of the Improve I-70 program. Learn more at modot.org/improvei70/columbiakingdomcity.

I-70 - New pavement construction continues in Columbia from Route B (Paris Road) to east of the Connector (east of exit 128A) through January 2027 as part of the Improve I-70 program.Motorists can expect intermittent and long-term lane closures for the duration of the project. Learn more at modot.org/improvei70/columbiakingdomcity.

Callaway County

I-70 - Bridge maintenance planned Nov. 11 - 13 at the Cedar Creek Bridge. One lane will remain open, work will be taking place nightly, 8 p.m. to 6 a.m.

Route Z - Culvert replacement planned Nov. 13. The road will be CLOSEDfrom Lowry Lane to I-70, 7 a.m. to 2:30 p.m. Motorists must use an alternate route.

Route Z - Culvert replacement planned Nov. 14. The road will be CLOSEDfrom County Road 140 at the Auxvasse Creek Bridge, 7 a.m. to 2:30 p.m. Motorists must use an alternate route.

U.S. Route 54 - Resurfacing continues from Holts Summit to Fulton. Single-lane closures will occur at varying times, depending on the location. Expect delays during morning/evening rush hours. The project is expected to continue through November 2024.

I-70- New pavement construction continues from the Boone County line to Kingdom City(near mile marker 145) as part of the Improve I-70 Program. Motorists can expect intermittent and long-term lane closures for the duration of the project. Learn more at modot.org/improvei70/columbiakingdomcity

Camden County

Route A -Culvert replacements planned Nov. 12 - 13 in several locationsbetween U.S. Route 54 and Richland.The road will be CLOSED daily, 8 a.m. to 3:30 p.m

  • Nov. 12
  • Closed from Armstrong to Booger Holler (approximately 2 miles south of U.S. Route 54).
  • Closed from Mountainview Road to Seven Springs Road (approximately 5 miles north of Richland).
  • Nov. 13
  • Closed from Michaels Way to Black Oak Road (just east of Route C).

Route N - Culvert replacement planned Nov. 13 from Three Willis Road to Hazel Valley Drive. The road will be CLOSED daily, 8 a.m. to 3:30 p.m. Motorists must use an alternate route.

Route W - Culvert replacements planned Nov. 14 - 15 in several locations. The road will be CLOSED daily, 8 a.m. to 3:30 p.m.

  • Nov. 14
  • Closed from Heise Road to Ambrosia Lane (approximately 1.2 miles north of U.S. Route 54).
  • Nov. 15
  • Closed from Cemetary Road to east Buffalo Linn Creek Road (approximately 0.8 miles north of U.S. Route 54).

Cole County

Route B -Bridge rehabilitation continues over the Moreau River near Wardsville. One lane will remain open and temporary traffic signals are in place to guide motorists through the work zone. The project is scheduled for completion in November2024.

Route D - Bridge deck replacement continuesover North Moreau Creek Bridge. The road is CLOSED between Hunters Haven Drive and Knoll Road, anda signed detour isin place. The project is scheduled for completion in December 2024.

Cooper County

I-70- Bridge construction continues for the new Rocheport Bridge near mile marker 115. The new eastbound bridge is scheduled to open to traffic in December 2024. 

Crawford County

Route PP - Roadside work planned Nov. 12- 15from RutzSubdivision Road to Lick Creek Road. One lane will remain open, and crews will flag traffic through the work zone.

Route Y - Culvert replacement planned Nov. 12 - 15 from Missouri Route 49in Viburnum (Iron County)to Route V. One lane will remain open, and crews will flag traffic through the work zone.

Missouri Routes 8 and 19 - Upgrades to pedestrian facilities in the city of Steelville. One lane will remain open in each direction, and crews will flag traffic through the work zones. The project is scheduled for completion in November.  

Howard County

U.S. Route 40 - Shoulder work planned Nov. 12- 15 from Missouri Route 87 to Missouri Route 5. One lane will remain open, and crews will flag traffic through the work zone.

Missouri Route 240 - Culvert replacement planned Nov. 12- 15from County Road 436 to U.S. Route 40. One lane will remain open, and crews will flag traffic through the work zone.

Missouri Route 3 - Culvert replacement planned Nov. 12- 15 from County Road 238 to County Road 244. One lane will remain open, and crews will flag traffic through the work zone.

Laclede County

Route VV - Culvert replacement planned Nov. 11 - 12. The road will be CLOSEDfrom Lonesome Road to Missouri Route 5, 8:30 a.m. to 2:30 p.m. Motorists must use an alternate route.

Route E - Culvert replacement planned Nov. 14 - 15. The road will be CLOSEDfrom Bluff Trail Road to Route NN, 8:30 a.m. to 2:30 p.m. daily. Motorists must use an alternate route.

Route O - Bridge maintenance planned Nov. 12 - 22 at the Gasconade River Bridge. One lane will remain open, and crews will flag traffic through the work zone.

Missouri Route 64 - Bridge replacementcontinuesat the Goodwin HollowCreek Bridge.The road is CLOSEDto all trafficwith asigned detour inplace. The project is scheduled for completion in November2024.

Route B - Bridge deck replacement continuesat the Osage Fork Bridge. The road is CLOSEDto all trafficwith asigned detour in place.The project is scheduled for completion in November 2024.

MariesCounty

Missouri Route 42 - Roadside work planned Nov. 12- 15from the city of Vienna to the city of Belle. One lane will remain open, and crews will flag traffic through the work zone.

Route C - Roadside work planned Nov. 12 - 15 from Missouri Route 28 to Route H. One lane will remain open, and crews will flag traffic through the work zone.

Moniteau County

Missouri Route 87 - Culvert replacement planned Nov. 12 - 13 from Route D (Cooper County) to Route U. One lane will remain open, and crews will flag traffic through the work zone.

Osage County

Route 63 - Pavement repairs planned Nov. 11 - 15 at Route JJ. One lane will remain open, and crews will flag traffic through the work zone.

Route 63 - Roadside work planned Nov. 12- 15in the city limits of Freeburg. One lane will remain open, and crews will flag traffic through the work zone.

Phelps County

Route H - Culvert replacement planned Nov. 13 at the Little PineyCreek bridge. One lane will remain open, and crews will flag traffic through the work zone.

Route J - Culvert replacement planned Nov. 13 at the Spring Creek bridge. One lane will remain open, and crews will flag traffic through the work zone.

I-44 -Road resurfacing and reconstruction continues from Exit 186 in Rolla to Exit 195 in St. James. Expect around-the-clock lane closures from U.S. Route 63 to Missouri Route 68. An 11-foot width restriction is in place. The end date for the project is yet to be determinedbased on concrete qualityissuesthat will need to be corrected. Learn more: https://www.modot.org/node/54613

Washington County

Route 47 - Bridge rehabilitation continuesover Mineral Fork Creek. Traffic is narrowedto one lane with temporary signals in place. The project is scheduled for completion in November 2024.

MoDOT asks all motorists to work with us by buckling up, putting your phone down, obeying all traffic signs, and slowing down and moving over in work zones.

For more information about MoDOT projects, traffic updates, or other transportation-related matters, please visit our Traveler Information Map at http://traveler.modot.org/ or call our 24-hour Customer Service Center at 1-888-ASK-MoDOT (888 275-6636). While at modot.org, sign up for work zone updatessent directly to your inbox. Information is also available 24/7 by connecting with us on social media:

Facebook| X (Twitter)| Instagram

Take the Challenge! Buckle Up/Phone Down

###

Districts Involved
Central
Published On
Fri, 11/08/2024 - 05:37
Links to related information