What: Weather permitting, the Georgia Department of Transportation (Georgia DOT) construction partners will temporarily close interstate lanes at the locations below for the I-285/I-20 East Interchange project. The project will reconstruct the interstate system-to system ramps at the I-285/I-20 East Interchange and add a combination of collector distributor, or connecting lanes, and auxiliary lanes along I-20 east of the interchange and I-285 north of the interchange
Where/When:
I-20 from Wesley Chapel (MM 69.5) to Panola Road (MM 71.3)
-
Friday, October 11, at 9 p.m. through Monday, October 14, at 5 a.m. (Continuous)
Continuous, double, right-lane and right-shoulder closures on I-20 eastbound
I-285 from Glenwood Road (MM 44.4) to the I-20 Interchange (MM 46.3)
-
Monday, October 14 through Saturday, October 19, from 8 p.m. to 6 a.m. (Nightly)
Double, right-lane and right-shoulder closures on I-285 northbound and southbound
I-20 from Wesley Chapel Road (MM 69.5) to Panola Road (MM 71.3)
-
Monday, October 14, through Friday, October 18, from 9 a.m. to 2 p.m. (Daily)
Single, right-lane and shoulder closure on I-20 eastbound
I-20 from Panola Road (MM71.3) to Wesley Chapel Road (MM 69.5) (Nightly)
-
Sunday, October 13, through Saturday, October 19, from 9 p.m. to 5 a.m. (Nightly)
Single, right-lane and shoulder closure on I-20 westbound
I-20 eastbound from the I-285 Interchange (MM 67.3) to Wesley Chapel Road (MM 69.5)
-
Monday, October 14, through Saturday, October 19, from 9 a.m. to 2 p.m. (Daily)
Single, right-lane and right-shoulder closure on the connecting lanes or collector-distributor (CD) lanes
I-20 from Columbia Drive (MM 66.8) to the I-285 Interchange (MM 67.3)
-
Monday, October 14, through Saturday, October 19, from 9 a.m. to 2 p.m. (Daily)
Single, right-lane and right-shoulder closure on I-20 eastbound
I-20 from Panola Road (MM 71.3) to the Fairington Road overpass (MM 72.6)
-
Monday, October 14, through Friday, October 18, from 9 a.m. to 2 p.m. (Daily)
Single, right-lane and right-shoulder closure on I-20 eastbound
Hillandale Drive eastbound from east of Panola Road to DeKalb Medical Parkway
-
Monday, October 14, through Friday, October 18, from 9 a.m. to 3 p.m. (Daily)
Flagging operation
I-20 from Panola Road (MM 71.4) to Wesley Chapel Road (MM 69.3)
-
Monday, October 14, through Saturday, October 19, from 11 p.m. to 5 a.m. (Nightly)
Alternating, double, left- and right-lane and shoulder closures on I-20 eastbound and westbound
I-20 from the westbound ramp to I-285 northbound (Exit 67B)
-
Monday, October 14, through Saturday, October 19, from 11 p.m. to 5 a.m. (Nightly)
Traffic pacing operation on the I-20 westbound ramp
I-285 southbound exit ramp to the I-20 eastbound ramp
-
Monday, October 14, through Saturday, October 19, from 11 p.m. to 5 a.m. (Nightly)
Single, left-lane and left-shoulder closure on the connecting lanes
I-20 from the I-285 Interchange (MM 67.3) to Wesley Chapel Road (MM 69.3)
-
Monday, October 14, through Saturday, October 19, from 11 p.m. to 5 a.m. (Nightly)
Alternating, double, left- and right-lane closures on I-20 eastbound and westbound
I-20 from the I-285 Interchange (MM 67.3) to Wesley Chapel Road (MM 69.5)
-
Monday, October 14, through Saturday, October 19, from 11 p.m. to 5 a.m. (Nightly)
Traffic pacing operation on I-20, both eastbound and westbound
I-20 from Panola Road (MM 71.3) to the Fairington Road overpass (MM 72.6)
-
Monday, October 14, through Saturday, October 19, from 11 p.m. to 5 a.m. (Nightly)
Alternating, double, left- and right-lane closures on I-20 eastbound and westbound
I-20 from Columbia Drive (MM 66.8) to Panola Road (MM 71.3)
-
Tuesday, October 15, through Thursday, October 17, from 1 p.m. until 2:30 p.m. (Daily)
Traffic pacing operation on I-20 eastbound, traffic will be held for up to five minutes
I-20 entrance ramps at Panola Road (MM 71.6) and Wesley Chapel Road (MM 69.5)
-
Tuesday, October 15, through Thursday, October 17, from 1 p.m. until 2:30 p.m. (Daily)
Traffic pacing operation on I-20 westbound, traffic will be held for up to five minutes
I-20 from the I-285 Interchange (67.3) to Miller Road (69.8), including the westbound entrance ramp from Wesley Chapel Road (Exit 68)
-
Monday, October 14, through Saturday, October 19, from 11 p.m. to 5 a.m. (Nightly)
Traffic pacing operation on I-20 eastbound and westbound
I-20 from Panola Road (MM 71.4) to Wesley Chapel Road (MM 68.5)
-
Monday, October 14, through Saturday, October 19, from 9 p.m. to 6 a.m. (Nightly)
Alternating, single, left- and right-lane and shoulder closures on I-20 eastbound and westbound
I-20 from Panola Road (MM 71.4) to Wesley Chapel Road (MM 68.5)
-
Monday, October 14, through Saturday, October 19, from 11 p.m. to 5 a.m. (Nightly)
Alternating, double, left- and right-lane and shoulder closures on I-20 eastbound and westbound
|
Activity
|
Start Date
|
End Date
|
Times
|
I-20 Westbound
|
-
I-20 from Panola Road to Wesley Chapel Road
|
Single, right-lane and right-shoulder closure
|
10/13/24
|
10/19/24
|
9 p.m. - 5 a.m.
|
-
I-20 from the westbound ramp to I-285 northbound
|
Traffic Pacing operation
|
10/14/24
|
10/19/24
|
11 p.m. - 5 a.m.
|
-
I-20 from Panola Road to Wesley Chapel Road
|
Alternating, double, left- and right-lane and shoulder closures
|
10/14/24
|
10/19/24
|
11 p.m. - 5 a.m.
|
-
I-20 from Wesley Chapel Road to the I-285 Interchange
|
Traffic pacing operation
|
10/14/24
|
10/19/24
|
11 p.m. - 5 a.m.
|
-
I-20 from Wesley Chapel Road to the I-285 Interchange
|
Alternating double left and right lane closures
|
10/14/24
|
10/19/24
|
11 p.m. - 5 a.m.
|
-
I-20 from the Fairington Road overpass to Panola Road
|
Alternating, double, left- and right-lane closures
|
10/14/24
|
10/19/24
|
11 p.m. - 5 a.m.
|
-
Entrance ramps at Panola Road and Wesley Chapel Road
|
Traffic pacing operation
|
10/15/24
|
10/17/24
|
1 p.m. - 2:30 p.m.
|
-
I-20 from Miller Road to the I-285 Interchange, including the Wesley Chapel Road entrance ramp
|
Traffic pacing operation
|
10/14/24
|
10/19/24
|
11 p.m. - 5 a.m.
|
-
I-20 from Panola Road to Wesley Chapel Road
|
Alternating, single, left- and right-lane and shoulder closures
|
10/14/24
|
10/19/24
|
9 p.m. - 6 a.m.
|
-
I-20 from Panola Road to Wesley Chapel Road
|
Alternating, double, left- and right-lane and shoulder closures
|
10/14/24
|
10/19/24
|
11 p.m. - 5 a.m.
|
I-20 Eastbound
|
-
I-20 from Wesley Chapel Road to Panola Road
|
Continuous, double, right-lane and shoulder closure
|
10/11/24
|
10/14/24
|
9 p.m. - 5 a.m.
|
-
I-20 from Wesley Chapel Road to Panola Road
|
Single, right-lane and shoulder closure
|
10/14/24
|
10/18/24
|
9 a.m. - 2 p.m.
|
-
I-20 from Panola Road to the Fairington Road overpass
|
Single, right-lane and right-shoulder closure
|
10/14/24
|
10/18/24
|
9 a.m. - 2 p.m.
|
-
I-285 Interchange to Wesley Chapel Road
|
Traffic pacing operation
|
10/14/24
|
10/19/24
|
11 p.m. - 5.a.m.
|
-
I-20 connecting (CD) lanes from the I-285 Interchange to Wesley Chapel Road
|
Single, right-lane and right-shoulder closure
|
10/14/24
|
10/19/24
|
9 a.m. - 2 p.m.
|
-
I-20 eastbound from Columbia Drive to the I-285 Interchange
|
Single, right-lane and right-shoulder closure
|
10/14/24
|
10/19/24
|
9 a.m. - 2 p.m.
|
-
I-285 Interchange to Wesley Chapel Road
|
Alternating, double, left- and right-lane and shoulder closures
|
10/14/24
|
10/19/24
|
11 p.m. - 5 a.m.
|
-
I-20 from Panola Road to the Fairington Road overpass
|
Alternating, double, left- and right-lane closures
|
10/14/24
|
10/19/24
|
11 p.m. - 5 a.m.
|
-
From Columbia Drive to Panola Road
|
Traffic pacing operation
|
10/15/24
|
10/17/24
|
1 p.m. - 2:30 p.m.
|
-
I-20 from the I-285 Interchange to Miller Road
|
Traffic pacing operation
|
10/14/24
|
10/19/24
|
11 p.m. - 5 a.m.
|
-
I-20 from Wesley Chapel Road to Panola Road
|
Alternating, single, left- and right-lane and shoulder closures
|
10/14/24
|
10/19/24
|
9 p.m. - 6 a.m.
|
-
I-20 from Wesley Chapel Road to Panola Road
|
Alternating, double, left- and right-lane and shoulder closures
|
10/14/24
|
10/19/24
|
11 p.m. - 5 a.m.
|
I-285 Southbound
|
|
|
|
|
-
From the exit ramp to the I-20 eastbound connecting lanes
|
Single, left-lane and left-shoulder closure
|
10/14/24
|
10/19/24
|
11 p.m. - 5 a.m.
|
-
From Glenwood Road to the I-20 Interchange
|
Double, right-lane and right-shoulder closure
|
10/14/24
|
10/19/24
|
8 p.m. - 6 a.m.
|
I-285 Northbound
|
|
|
|
|
-
From the I-20 Interchange to Glenwood Road
|
Double, right-lane and right-shoulder closure
|
10/14/24
|
10/19/24
|
8 p.m. - 6 a.m.
|
Hillandale Drive Eastbound
|
|
|
|
|
-
From east of Panola Road to DeKalb Medical Parkway
|
Flagging operation
|
10/14/24
|
10/18/24
|
9 a.m. - 3 p.m.
|
|
|
Advisory: Exact time may change due to weather conditions. Motorists are advised to expect delays, exercise caution, and reduce their speed while traveling through work zones, stay alert, and watch for workers. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org, or download the Georgia 511 app.
|
|
|