What: Weather permitting, the Georgia Department of Transportation (Georgia DOT) construction partners will temporarily close interstate lanes at the locations below for the I-285/I-20 East Interchange project. The project will reconstruct the interstate system-to system ramps at the I-285/I-20 East Interchange and add a combination of collector distributor, or connecting lanes, and auxiliary lanes along I-20 east of the interchange and I-285 north of the interchange
Where/When:
I-20 from Panola Road (MM 71.3) to the Fairington Road overpass (MM 72.6)
-
Monday, July 8, and Tuesday, July 9, from 9 a.m. to 2 p.m. (Daily)-
Single right lane and right shoulder closure on I-20 eastbound
I-20 from Panola Road (MM 71.3) to the Fairington Road overpass (MM 72.6)
-
Monday, July 8, through Saturday, July 13, from 9 p.m. to 5 a.m. (Nightly)-
Alternating double left and right lane closures on I-20 eastbound and westbound
|
Activity
|
Start Date
|
End Date
|
Times
|
I-20 Westbound
|
-
I-20 from the Fairington Road overpass to Panola Road
|
Alternating double left and right lane closures
|
7/8/24
|
7/13/24
|
9 p.m. - 5 a.m.
|
I-20 Eastbound
|
|
Traffic Pacing operation
|
7/8/24
|
7/12/24
|
11 p.m. - 5.a.m.
|
-
I-20 from Panola Road to the Fairington Road overpass
|
Single right lane and right shoulder closure
|
7/8/24
|
7/9/24
|
9 a.m. - 2 p.m.
|
-
I-20 from Panola Road to the Fairington Road overpass
|
Alternating double left and right lane closures
|
7/8/24
|
7/13/24
|
9 p.m. - 5 a.m.
|
|
|
Advisory: Exact time may change due to weather conditions. Motorists are advised to expect delays, exercise caution, and reduce their speed while traveling through work zones, stay alert, and watch for workers. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org, or download the Georgia 511 app.
|
|
|